Trend Analysis
You can use the Acumen Fuse trend analysis feature to replace the traditional time-based phases in the diagnostics view with project snapshots.
Note: You need to have a project loaded with at least one snapshot to use this feature.
Similar to a phase analysis, the Acumen Fuse engine calculates results across ribbons within each snapshot.
Example of a Trend Analysis
This example shows a trend analysis across the following project snapshots:
- The initial plan
- 1-month update
- 6-month update
- Current schedule
The Total Activities metric has been added to the intersection analyzer and the activities have been grouped by status. In this view you can see the number of activities that are planned, in-progress, or complete for each project snapshot.
The Phase Analyzer shows the total metric result for each snapshot.